Figure 4-10. Resistors, removal and installation.
Figure 4-12. Switching panel, removal and installation.

Gas Welding Machine, 300 Amp, 10 To 400 Amp, Ac, Str Polarity, 10 To 300 Amp Dc, Reverse Polarity
Page Navigation
  41    42    43    44    45  46  47    48    49    50    51  
img
. . . . . . . . . . . . . . . . . . . . . . . . . . . .
TM
5-3431-203-15
Section VIII. TIMER RELAY, SWITCHING PANEL, FILTER
REACTOR, REACTOR COIL AND TESLA COIL
b. Installation.
4-27. Timer Relay
(1) Refer to figure 4-12 and install the
a. Removal.
switching panel.
(1) Remove the high frequency panel
(2) Install the contactor screws (para 3-
assembly (para 3-27).
41).
(2) Refer to figure 4-11 and remove the
(3) Install the welding machine top and
timer relay.
housing (para 3-26).
b. Installation.
(1) Refer to figure 4-11 and install the
4-29. Filter Reactor
timer relay.
a. Removal.
(2) Install the high frequency panel as-
(1) R e m o v e the welding machine top
sembly (para 3-27).
and housing (para 3-26).
(2) Remove the rectifier assembly (para
4-28. Switching Panel
4-23) .
a. Removal.
(3) Disconnect the filter reactor lead
(1) R e m o v e the welding machine top
from the polarity switch (para 4-
and housing (para 3-26).
19).
(2) Remove the contactor screws (para 3-
(4) Refer to figuue 4-13 and remove the
41).
filter reacher.
(3) Refer to figure 4-12 and remove the
b. Testing. Connect an ohmmeter to the
switching panel.
filter reactor leads and check from an open cir-
cuit.
c. Installation.
(1) Refer to figure 4-13 and install the
filter reactor.
(2) Connect the filter reactor lead to the
polarity switch (para 4-19).
(3) Install the rectifier assembly (para
4-23).
(4) Install the welding machine top and
housing (para 3-26).
4-30. Reactor Coil
a. Removal.
(1) Remove the welding machine top and
housing (para 3-26).
(2) Remove the rectifier assembly (para
4-23) .
(3) Disconnect the coil lead from the
polarity switch (para 4-19).
(4) Refer to figure 4-13 and remove the
reactor coil.
b. Testing.  Connect a multiimeter to the
tail leads and set the meter on ohms. If the
indicator gives no reading, the coil has an op-
en circuit and must be replaced.
4-15