• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Section VI. FIELD EXPEDIENT REPAIRS
Figure 3-5. Welding machine top and housing, removal and installation.

Gas Welding Machine, 300 Amp, 10 To 400 Amp, Ac, Str Polarity, 10 To 300 Amp Dc, Reverse Polarity
Page Navigation
  16    17    18    19    20  21  22    23    24    25    26  
img
. . . . . . . . . . . . . . . .
TM
5-3431-203-15
(2) Disconnect jack tip terminals and pan-
3-26. Welding Machine Top and Housing
el wiring harness quick-disconnect
a. Removal.
plug.
(1) Refer to figure 3-5 and remove the
(3) Refer to figure 3-6 and remove the
welding machine top.
high frequency panel assembly.
(2) Remove the fan, motor, and guard as-
b. Installation.
sembly (para 3-52).
(1) Refer to figure 3-6 and install the
(3) Remove the gas and water solenoid
high frequency panel assembly.
valves (para 3-49 and 3-50).
(2) Connect the jack tip terminals and the
(4) Refer to figure 3-5 and remove the
quick-disconnect
harness
wiring
housing.
lug.
b. Installation.
(3) Close and lock the panel door.
(1) Refer to figure 3-5 and install the
housing.
3-28. Panel Door Lock
(2) Install the gas and water solenoid
a. Removal.
valves (para 3-49).
(1) Unlock and open the high frequency
(3) Install the fan, motor, and guard as-
panel door.
sembly (para 3-52).
(2) Refer to figure 3-7 and remove the
(4) Refer to figure 3-5 and install the
panel door lock.
welding machine top.
b. Installation.
(1) Refer to figure 3-7 and install the
3-27. High Frequency Panel Assembly
panel door lock.
(2) Close and lock the high frequency pan-
a. Removal.
el door.
(1) Unlock and open panel door.
3-7


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.