• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 4-6. Control rectifier, removal and installation.
Figure 4-8. Rectifier assembly, disassembly and reassembly

Gas Welding Machine, 300 Amp, 10 To 400 Amp, Ac, Str Polarity, 10 To 300 Amp Dc, Reverse Polarity
Page Navigation
  35    36    37    38    39  40  41    42    43    44    45  
img
. . . . . . . . . . . . . . .
TM 5-3431-203-15
Figure 4-7. Rectifier assembly and diodes, removal and installation.
(2) Remove the high frequency panel as-
(2) Remove the high frequency panel as-
sembly (para 3-27).
sembly (para 3-27).
(3) Refer to figure 4-9 and remove the
(3) Refer to figure 4-10 and remove the
capacitors.
resistors.
b. Testing. Connect a suitable capacitor
tester to the wire leads and check the capaci-
b. Testing. Connect an ohmmeter to the
resistor leads and check the resistance.  The
tors for open oir shorted circuit.
meter reading must conform with the resistor
c. Installation.
(1) Refer to figure 4-9 and install the
values shown on the wiring diagram (fig. 4-
1).
capacitors.
(2) Install the high frequency panel as-
c. Installation.
sembly (para 3-27).
(1) Refer to figure 4-10 and install the
(3) Install the welding machine top and
resistors.
housing (para 3-26).
(2) Install the high frequency panel as-
4-26. Resistors
sembly (para 3-27).
a. Removal.
(3) Install the welding machine top and
(1) Remove the welding machine top
and housing (para 3-26).
housing (para 3-26).
4-8


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.