Figure 3-8. Pilot lights and gas, water, power, and high frequency switches, removal and installation.
Figure 3-10. Interlock, spot arc, and drop out switch, removal and installation.

Gas Welding Machine, 300 Amp, 10 To 400 Amp, Ac, Str Polarity, 10 To 300 Amp Dc, Reverse Polarity
Page Navigation
  20    21    22    23    24  25  26    27    28    29    30  
img
. . . . . . . . . . . . .
TM 5-3431-203-15
Figure 3-9. Timers and dummy plug, removal and installation.
Warning:  Performances of any field ex-
b. Installation
pedient repair creates a condition possibly
Refer to figure 3-9 and, install the
dangerous to the equipment or personnel. A
timers.
welding machine so repaired should be taken
Close and lock the high frequency
panel door.
out of service as soon as possible for replace-
ment of the defective part.
3-35. Interlock Switch
3-36. High Frequency Spot ARC Switch
a. Removal.
a. Removal.
(1) Remove the high frequency panel as-
sembly (para 3-27).
(1) Remove the high frequency panel as-
(2) Refer to figure 3-10 and remove the
sembly ( para 3-27).
interlock switch.
(2) Refer to figure 3-10 and remove the
b. Installation.
high frequency spot arc switch.
(1) Refer to figure 3-10 and install the
interlock switch.
b. Installaion.
(2) Install the high frequency panel as-
(1) Refer to figure 3-10 and install the
sembly (para 3-27).
high frequency spot arc switch.
c. Field Expdient Repair. If. the interlock
(2) Install the high frequency panel as-
switch is defective, place a jumper wire across
sembly (para 3-27).
the terminals and bypass the switch.