TM 5-3431-203-15
Section Vlll. PILOT LIGHTS, SWITCHES, TIMERS, REMOTE
b. Installation.
The pilot lights indicate the phase of oper-
pilot lights.
a t i o n that the machine is performing.
The
( 2 ) Install the high frequency panel as-
s w i t c h e s control the power, gas, water, and
s o c k e t s for easy r e m o v a l and maintenance;
t h e y control the postflow of gas and water,
the preflow of gas and water, shut off high
a. Removal.
frequency oscillation at a predetermined time,
(1) Remove the high frequency panel
as-
a n d control the length of time the welding
power is on. The dummy plugs are used when
the
timers are not in the socket.
power switch.
b. Installation.
the
a. Removal.
power switch.
(2) Install the high f r e q u e n c y panel
as-
( 2 ) Remove the high frequency panel as-
a. Removal.
pilot lights.
(1) Remove the high frequency panel
gas-water switch.
b. Installation.
gas-water switch.
333. High Frequency Switch
a. Removal.
(1) Remove the high frequency panel
as-
the
high frequency switch.
b. Installation.
the
high frequency switch.
as-
a. Removal.
(1) Unlock and lower the high fre-
quency panel door.
timers.
high frequency switches, removal and installation.