coil.
a. Removal.
b. Installation.
(1) Disconnect ac power from the welding ma-
(1) Refer to figure 6-8 and install the tesla coil.
chine.
6-21. Filter Reactor L1 and Reactor Coil
a. Removal.
(1) Disconnect ac power from the welding ma-
chine.
(3) Remove top and housing from the welding
(4) Remove the power rectifier assembly (para
actor or filter reactor coil.
b. Testing. Connect an ohmmeter across the re-
actor coil and check for an open circuit, indicating a
defective coil.
c. Installation.
(1) Refer to figure 6-5 and install the coil on the
T1.
(2) Install the power rectifier assembly (para