TM 5-3431-225-15
(3) Connect a voltrneter to the secondary
leads (numbers 31 and 32). The meter should
read 30 volts.
air coupling coil.
leads (numbers 41 and 42). The meter should
read 15 volts.
(5) If the meter reading is other than that
4-30. Control
Transformer
(1) Remove the top and sides from the
(2) Install the top and sides on the welding
b. Testing.
(1) Connect the 230 volt power source to
the input lead No. 16 and the center tap lead
a. Removal.
No. 40.
(1) Remove the top and sides from the
(2) Remove the range and polarity switch
leads (numbers 1 and 4). The meter reading
should be 115 volts.