Home
Download PDF
Order CD-ROM
Order in Print
Figure 3-21. Inspection of torus.
Figure 3-23. Inspection of nozzle.
TM-5-6115-586-34 Power Plant Utility; Gas Turbine Engine Driven Libby Welding Co. Model LPU-71 FSN 6115-165-3842 Manual
Page Navigation
63
64
65
66
67
68
69
70
71
72
73
Figure
3-22.
Inspection
of liner.
repaired
or
replaced
if
damage
exceeds
the
limits
shown
(4)
Perform
fluorescent
penetrant
inspection
in
figure
3-23.
in
accordance
with
Military
Specification
MIL-L-6866
on
nozzle
(59,
fig.
3-12,
sheet
2 of
2).
Nozzle
must
be
3-37