• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
CHAPTER 4 DEMOLITION, SHIPMENT, AND LIMITED STORAGE
Loading Equipment for Shipment

Welding M Arc: Generator, Electric Motor Driven, 300 Amp Dc, Arc, 220/440 60 Cycle, 3 Phase, Wheel Mounted
Page Navigation
  25    26    27    28    29  30  31    32    33    34    35  
img
.
Figure 15. Placement of demolition charges
Section II. SHIPMENT AND LIMITED STORAGE
Maintenance Service, Quarterly, " paragraph 37.
74. Preparation of Equipment for Shipment
c.  Cleaning and Drying.  All contamination will be
a. General. Detailed instructions for the preparation
removed from the welding machine by an approved
of the welding machine for domestic shipment are
method. Approved methods of cleaning, drying, types
outlined within this paragraph.  Preservation will be
of preservatives, and methods of application are
accomplished in sequence that will not require the
described in TM 38-230.
operation of previously preserved components.
d. Painting. Paint all surfaces where the paint has
b. Inspection. The welding machine will be inspected
been removed or damaged.  Refer to TM 9-213 for
for any unusual conditions such as damage, rusting,
detailed cleaning and painting instructions.
accumulation of water, and pilferage.  Inspection of
individual components and assemblies will be as
outlined on the "Preventive
AGO 8244A
31


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.