TM 1-4920-445-13&P
FIELD MAINTENANCE
COMPOSITE SHOP
MAINTENANCE INSTRUCTIONS FOR EYEWASH STATION ASSEMBLY BRACKET AND HARDWARE
INITIAL SETUP:
Personnel Required
Tools and Special Tools
CMF 15 Series (2)
General Mechanics Tool Kit
References
Sperian Fendall Pure Flow 1000 Eyewash Station
Owner s Manual
Materials/Parts
Equipment Condition
Eyewash Station Removed
INSPECTION OF INSTALLED ITEMS
NOTE
During installation of components same hardware should be used so as to maintain original
integrity of shop set.
Figure 1.
Eyewash Station.
1.
Inspect eyewash station bracket (Figure 1, Item 4) for damage. Replace as necessary.
2.
Inspect eyewash station bracket hardware (Figure 1, Item 1 through 3) for rust, cracks and rounded heads.
Replace as necessary.
REMOVAL
1.
If necessary, drain eye and face wash fountain solution IAW Eyewash Station Owner s Manual.
2.
Remove two bolts (Figure 1, Item 1), two lock washers (Figure 1, Item 2), two lat washers (Figure 1, Item 3),
and eyewash station bracket (Figure 1, Item 4).
0048 00-1