INSPECTION OF INSTALLED ITEMS CONTINUED
1.
Move main circuit breaker to OFF position.
2.
Remove four screws (Figure 1, Item 3) attaching power entry panel cover (Figure 1, Item 1) which is located
below circuit breaker panel.
3.
Remove power entry panel cover (Figure 1, Item 1) from power entry panel.
4.
Visually inspect BNC connectors (Figure 1, Item 4) and cable (Figure 1, Item 2) for damage.
5.
Move main circuit breaker to ON position.
TEST AND INSPECTION
1.
Move main circuit breaker to OFF position.
2.
Remove four screws (Figure 1, Item 3) attaching power entry panel cover (Figure 1, Item 1) which is located
below circuit breaker panel.
3.
Remove power entry panel cover (Figure 1, Item 1) from power entry panel.
4.
Test BNC connector (Figure 1, Item 2) for continuity.
5.
Replace BNC connector (Figure 1, Item 2) if breakage is detected.
6.
Move main circuit breaker to ON position.