• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
MAINTENANCE INSTRUCTIONS FOR BAYONET NEILL-CONCELMAN (BNC) CONNECTOR ASSEMBLY
Figure 2. Replace BNC Connector Assembly.

Machine/Welding Shop P/N Sc492099Cla63
Page Navigation
  205    206    207    208    209  210  211    212    213    214    215  
img
0050 00
TM 1-4920-445-13&P
INSPECTION OF INSTALLED ITEMS CONTINUED
1.
Move main circuit breaker to OFF position.
2.
Remove four screws (Figure 1, Item 3) attaching power entry panel cover (Figure 1, Item 1) which is located
below circuit breaker panel.
3.
Remove power entry panel cover (Figure 1, Item 1) from power entry panel.
4.
Visually inspect BNC connectors (Figure 1, Item 4) and cable (Figure 1, Item 2) for damage.
5.
Move main circuit breaker to ON position.
TEST AND INSPECTION
1.
Move main circuit breaker to OFF position.
2.
Remove four screws (Figure 1, Item 3) attaching power entry panel cover (Figure 1, Item 1) which is located
below circuit breaker panel.
3.
Remove power entry panel cover (Figure 1, Item 1) from power entry panel.
4.
Test BNC connector (Figure 1, Item 2) for continuity.
5.
Replace BNC connector (Figure 1, Item 2) if breakage is detected.
6.
Move main circuit breaker to ON position.
0050 00-2


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.