0044 00
TM 1-4920-434-13&P
INSTALLATION CONTINUED
2.
Install two bolts (Figure 1, Item 1), two lock washers (Figure 1, Item 2), and two lat washers (Figure 1, Item
3).
Torque bolts (Figure 1, Item 1) 160-190 in. lbs.
3.
4.
Mount eyewash station onto eyewash station bracket (Figure 1, Item 4).
5.
Fill eyewash station with eye and face wash fountain solution IAW Sperian Eyewash Station Owner s Manual.
END OF WORK PACKAGE
0044 00-2