demand experience indicates a stock-
ized for use but not for initial stockage
age objective of at least one.
will be identified with an asterisk in
the allowance column.
Units with TOE capability of perform-
(3)
ing partial or complete field mainte-
g. Field Maintenance 15-Day Level, 3d and
nance for organic Mobility Command
4th Echelons.
equipment. Units organized under
(1) Third echelon. This column lists the
TOE's 5-114, 5-115, 5-117, 5-129, and
initial guide quantity allowance fac-
similar TOE's with the TOE capability
tors of repair parts authorized for ini-
of performing partial or complete field
tial stockage by Engineer Field Main-
maintenance for organic Mobility
tenance Shops (non-TOE), Engineer
Command equipment will be author-
ized to stock 3d and or 4th echelon re-
Field Maintenance Companies, Direct
pair parts only when specific agree-
Support (TOE 5-237), and similar
TOE units to provide 3d echelon main-
ments are made between the Com-
mander of the designated Engineer
tenance for Mobility Command equip-
Parts Supply Activity, normally Di-
ment and to provide organizational
maintenance repair parts for sup-
rect Support Units (DSU) and using
unit. Parts so furnished are in addi-
ported units for a 15-day period. Ad-
tion to the prescribed load and will be
ditional repair parts are allocated by
adjusted as demands indicate.
an asterisk for immediate use only.
Upon establishment of supply records,
(4) Units with TOE Mission to provide
recorded demand experience will be
maintenance for Mobility Command
used to compute stockage objectives
equipment of supported units. Units
on authorized repair parts. Review of
organized under TOE's such as 5-214
stockage objectives will be performed
and 5-500 with the assigned mission
in the time cycle prescribed by Major
to provide field maintenance for Mo-
Commanders. Repair parts allocated
bility Command equipment of sup-
for immediate use only may be stocked
ported units are authorized to stock
when demand experience indicates a
3d and 4th echelon repair parts. These
stockage of at least one.
repair parts will be issued from the
(2) Fourth echelon. This column lists ini-
appropriate parts supply activity
tial guide quantity allocation factors
( p a r t s depot and/or DSU). Such
Of repair parts authorized for initial
stockage is in addition to the pre-
stockage by Engineer Field Mainte-
scribed load and will be adjusted as
nance Shops (non-TOE), Engineer
demands indicate.
Heavy Maintenance Companies (TOE
5-278), and similar TOE units to pro-
h. Depot Maintenance, 5th Echelon. This col-
vide 4th echelon maintenance for
umn lists the quantity of repair parts recom-
Mobility Command equipment for a
mended for Engineer Depot Maintenance
15-day period. Additional repair parts
Shops (non-TOE) to provide depot maintenance
are allocated by an asterisk for imme-
for 100 equipments. Additional repair parts are
diate use only. Upon establishment of
allocated by an asterisk, for immediate use only.
supply records, recorded demand ex-
Explanation of the asterisk allowance is con-
perience will be used to compute stock-
tained in f above.
age objectives on authorized repair
parts. Review of the stockage objec-
i. Illustrations.
tives will be performed in the time
(1) Figure number. Indicates the number
cycle prescribed by Major Command-
of the illustration in which the part is
ers. Repair parts allocated for imme-
diate use only may be stocked when
shown.
vi