TM  1-4920-455-13&P
4.  Obtain  close  out  panel  (8)  from  overhead  rack
(7)  and  install  in  shelt  wall.
Torque  values  must  be  observed  to  prevent  pos-
sible  damage  to  equipment  or  the  shelter.  Im-
proper   procedures   could   result   in   extensive
damage   to   government   property.   See   App.   G.
5.  Position  exhaust  duct  assembly  (5)  on  shelter
wall,  alining  holes  inbrackets  (4)  with  wall  inserts.
Install  four  bolts  (1),  lockwasher  (2),  and  washers  (3)
and   torque.
2-29