CAUTION
CAUTION
TM 1-4920-455-13&P
2-6. Storage of Hardware.
Care  must  be  taken  to  ensure  that  proper  hardware  is  used  to  secure
equipment  for  transport.  Lack  of  correct  hardware  could  cause  exten-
sive  damage  to  equipment  or  the  shelter  when  shop  is  moved.
a.  All  hardware  removed  from  equipment  will  be  collected  and  placed  in  cotton  mailing  bags  (see  item  3,  App
E). Bags are stored in the shop storage chest until shelter is to be moved and equipment bolted to the floor.
b.  Position  storage  chest  (1)  in  mounting  bracket  (2).
2-7. Checking Shelter Level.
Once all equipment is in the recommended operational position recheck leveling of
shelter.  Use  procedures  in  TM  10-5411-201-14  to  verify  and  adjust  level.  Correct  adjustment  is  essential  to  ensure
proper operation of machine tools, doors and access panels. The Welding Shop is now operational.
2-8.
a.
b.
c.
SECTION Ill. PREPARING SHOP FOR SHIPMENT OR STORAGE
Recover and Inspect Equipment Hardware.
Remove  shop  storage  chest  from  mounting  brackets.
Care  must  be  taken  to  ensure  that  proper  hardware  is  used  to  secure
equipment  for  transport.  Lack  of  correct  hardware  could  cause  exten-
sive  damage  to  equipment  or  the  shelter  when  shop  is  moved.
Recover  cotton  mailing  bags  with  hardware  from  shop  storage  chest.
Inspect  hardware  for  damage  or  missing  parts.
2-26