• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
MAINTENANCE INSTRUCTIONS FOR FIRST AID BRACKET ASSEMBLY AND HARDWARE
MAINTENANCE INSTRUCTIONS FOR ECU POWER CABLE ASSEMBLY

Machine/Welding Shop P/N Sc492099Cla63
Page Navigation
  209    210    211    212    213  214  215    216    217    218    219  
img
.
0051 00
TM 1-4920-445-13&P
INSPECTION OF INSTALLED ITEMS CONTINUED
1.
Inspect irst aid bracket assembly (Figure 1, Item 1) for damage. Replace as necessary.
2.
Inspect irst aid bracket assembly hardware (Figure 1, Item 2 through 4 ) for rust, cracks, and rounded heads.
Replace as necessary.
REMOVAL
Remove two bolts (Figure 1, Item 4), two lock washers (Figure 1, Item 3), and two lat washers (Figure 1, Item
2) attaching irst aid bracket assembly (Figure 1, Item 1) to wall.
REPAIR OR REPLACEMENT
1.
If irst aid bracket assembly (Figure 1, Item 1) can be repaired by welding, weld damaged area IAW TM
1-1500-204-23. Repair must not interfere with form, it, or function of irst aid bracket assembly (Figure 1,
Item 1).
2.
Paint repaired irst aid bracket assembly (Figure 1, Item 1) IAW WP 0061 00, Figure 2.
INSTALLATION
1.
Position irst aid bracket assembly (Figure 1, Item 1) by aligning bolt holes with wall inserts.
2.
Install two bolts (Figure 1, Item 4), two lock washers (Figure 1, Item 3), and two lat washers (Figure 1, Item
2).
Torque bolts (Figure 1, Item 4) 160-190 in. lbs.
3.
4.
Mount irst aid kit onto irst aid bracket assembly (Figure 1, Item 1).
END OF WORK PACKAGE
0051 00-2


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.