TM 1-4920-434-13&P
MACHINE/WELDING SHOP
CHECKING SHELTER LEVEL
After all equipment is in recommended operational position, recheck leveling of shelter. See WP 0005 00-2, Initial
Leveling, to verify and adjust level. Correct leveling adjustments are essential to ensure proper operation of
machine tools, doors, and access panels.
The Machine/Welding Shop is now operational.
End of Work Package
0010 00-1/(0010 00-2 blank)