e. Column 5, Tools and Equipment. Column 5
of complexity of the tasks within the listed mainte-
specifies, by code, those common tool sets (not indi-
nance function vary at different maintenance lev-
vidual tools) and special tools, TMDE and support
els, appropriate "work time" figures will be shown
equipment required to perform the designated func-
for each level. The number of manhours specified by
tion.
the "work time" figure represents the average time
required to restore an item (assembly, subassembly,
f. Column 6, Remarks. This column shall, when
component, module, end item or system) to a ser-
applicable, contain a letter code, in alphabetical or-
viceable condition under typical field operating con-
der, which shall be keyed to the remarks contained
ditions. This time includes preparation time, trou-
in Section IV.
bleshooting time and quality assurance/quality
NOTE
control time in addition to the time required to per-
Excessive or extensive damage beyond
form the specific tasks identified for the mainte-
A VIM repair or replacement capabil-
nance allocation chart. The symbol designations for
ity should be returned to depot for
the various maintenance levels are as follows:
overhaul.
AVIM-operator.
B-2