WARNING
TM 1-4920-455-13&P
f.   Removing   External   Ground   Rod.
1. Remove external ground rod IAW TM 10-5411-201-14 and TC 11-6.
2.  Store  ground  rod  assembly  in  shop.
2-12.  Administrative  Storage  Procedures.
In  the  event  the  Welding  Shop  is  to  be  placed  in  administrative
storage, the provisions of AR 750-1, TM 55-1500-204-25/1, and applicable shop equipment TMs will be followed.
2-13. Closing the Shelter.
When  all  equipment  is  stored  on  the  stationary  side  of  the  shelter,  the
limited floor space presents an obstacle to operating personnel. This is
most critical during the raising and lowering of the roof panel. Failure
to observe closing instructions could result in serious injury to person-
nel.  Personnel  inside  the  shelter  could  become  trapped  between  the
roof  panel  and  equipment.
a.   Installing   Counterbalance   Cables.
1.  Remove  screws  (1)  at  both  corners  of  fold-out
floor.
2.   Install   cable   (2)   and   retainer   block   (3)   with
screws   (1).
3.  Proceed  with  closing  the  shelter  as  outlined
in  TM  10-5411-201-14.
b.  After  the  shelter  has  been  closed  and  prepared  in  accordance  with  TM  10-5411-201-14,  the  Welding  Shop  is
ready  for  transport  or  storage.
2-42