WARNING
TM   1-4920-455-13&P
CHAPTER  2
OPERATOR   INSTRUCTIONS
SECTION I. INITIAL SHOP EXPANSION
2-1. Placement of Welding Shop.  The Welding Shop should be located with power cable length, tactical deploy-
ment,  exhaust/inlet  of  ECUs  and  phasing  between  related  shops  kept  in  mind.  The  shops  power  entry  panel,  next
to  the  personnel  entrance  door,  should  be  facing  toward  the  power  source  and  power  distribution  panel.
2-2.  Shelter  Expansion
a.  Remove  shop  storage  chest,  located  on  fixed  sidewall  near  ceiling  at  cargo  entrance  door,  from  mounting
bracket  for  easy  access  to  hardware  and  tools.
b.  Observe  shelter  expansion  instructions  in  TM  10-5411-201-14  until  two  handles  of  solar  bar  are  extended
and  hinged  roof  is  slid  outward.  Continue  shelter  expansion  observing  supplemental  expansion  instructions  found
below.
c.  Supplemental  Expansion  Instructions.
When  all  equipment  and  materiel  is  stored  on  the  stationary  side  of
the  shelter,  the  limited  floor  space  presents  an  obstacle  to  operating
personnel.  This  is  most  critical  during  the  raising  and  lowering  of  the
roof   panel.   Failure   to   observe   supplemental   expansion   instructions
could  result  in  personnel  inside  the  shelter  becoming  trapped  between
the roof panel and equipment. Serious injury to personnel could result.
1.  Two  personnel,  outside  the  shelter,  must  lift
the roof panel (1) far enough to allow two people inside
to  release  the  support  struts  (2),  extend  them  to  full
length  and  insert  quick-release  pins  (3).
2-1