TM 1-4920-455-13&P
SECTION Ill. PRINCIPLES OF OPERATION
1-8.  After  the  shelter  has  been  expanded,  the  operator  will  unbolt  selected  items  of  equipment.  These  items  will
be moved to recommended positions on the expanded side of the shelter (see para., 1-7b). The selected items, when
moved, will not be secured (bolted) in place. This allows the shop personnel a certain flexibility in the event long or
bulky  material  must  be  repaired  within  the  shelter.  The  recommended  locations  were  selected  for  proper  utilization
of floor space and maximum safety for the operating personnel.
1-9.  Detailed  instructions  for  unbolting  equipment  and  the  recommended  sequence  for  movement  are  contained
in  Chapter  2,  Section  II.  Supplemental  procedures  for  opening  and  closing  the  shelter  are  contained  in  Chapter  2,
Sections I and III. TM 10-5411-201-14 is required for detailed instructions.
1-10.  Electrical  power  to  operate  the  Welding  Shop  is  provided  by  a  generator  or  a  commercial  power  source.  A
power distribution panel (PDP) is used between the power source and the power entry panel of the shelter. Overload
protection  is  provided  by  circuit  breakers.
1-4