0034 00
TM 1-4920-445-13&P
LOWERING SHELTER - CONTINUED
Figure 11.
Stowing Leveling Support Jack Assemblies.
6.
Replace four leveling support jack assemblies (Figure 11, Item 2) inside of personnel and right cargo doors
(Figure 11, Item 1) by turning locking handle (Figure 11, Item 5) to secure jack attachment (Figure 11, Item 3)
and insert safety pin (Figure 11, Item 4).
SECURING THE SHELTER
CAUTION
Left cargo door has a chain latch and a spring latch. These latches must be properly engaged
or door is not secure.
1.
Close shelter doors and check security of shelter.
WARNING
Door handle must be padlocked at 12 o clock position for shipping mode and 3 o clock position
for storage mode. Correct locking positions ensure that doors are secure and remain closed.
2.
Place padlocks on outside door handles.
3.
The Composite Shop is ready for transport or storage.
END OF WORK PACKAGE
0034 00-10