TM 1-4920-445-13&P
OPERATOR INSTRUCTIONS
COMPOSITE SHOP
PREPARING SHELTER FOR ECU STOWAGE
INITIAL SETUP:
Personnel Required
Tools and Special Tools
General Mechanics Tool Kit
CMF 15 Series (2)
Equipment Condition
Functional
NOTE
Skip this Work Package if ECUs are not installed
CLOSING ECU FOLD-DOWN PANELS
Figure 1.
Removing T-Seal.
1.
Remove T-seal (Figure 1, Item 1) from gap located between ECU (B) fold-down panel (Figure 1, Item 2) and
ECU (B) security screen at cargo end of shelter.
2.
Store T-seal (Figure 1, Item 1) in shelter BII box.
0031 00-1