• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 2. Connecting Compressed Air.
DISCONNECTING COMPRESSED AIR AND WATER

Machine/Welding Shop P/N Sc492099Cla63
Page Navigation
  80    81    82    83    84  85  86    87    88    89    90  
img
. . .
TM 1-4920-445-13&P
0020 00
OPERATOR INSTRUCTIONS
COMPOSITE SHOP
CHECKING SHELTER LEVEL
INITIAL SETUP:
Equipment Condition
Personnel Required
Functional
CMF 15 Series (2)
References
WP 0005 00
CHECKING SHELTER LEVEL
After all equipment has been placed in the suggested operational positions, recheck leveling of shelter. See
WP 0005 00, SITING Requirements, to verify and adjust shelter level. Correct leveling adjustments are essential
to ensure proper operation of equipment, tools, doors, and access panels.
The shop is now operational.
END OF WORK PACKAGE
0020 00-1/2 blank


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.