0012 00
TM 1-4920-434-13&P
GAS WELDING CART NO. 1
1. Remove four set screw plugs from inserts at transport location (see WP 0002 00, Figure 2).
2. Store plugs in appropriate storage location.
3. Position gas welding cart by rolling along floor to transport location.
4. Obtain four bolts (2), four lock washers (3), and four flat washers (4) from appropriate storage location.
5. Align holes in gas welding cart (1) with floor inserts and install bolts (2), lock washers (3), and flat washers (4).
6. Torque bolts 160-190 in. lbs.