(3) If self-clinching cable straps are removed
b. Disassembly.
After inspection and testing,
to facilitate repairs, install new cable straps at five inch
disassemble the wire harness only as required for repair
intervals and at all cable breakouts.
or replacement.
f. Installation. Install the wire harness assembly in
c. Cleaning and Inspection.
reverse order of removal procedure. After installing
(1) Clean wire harness with a clean, lint-free
connectors, safety wire in accordance with MS35540
cloth moistened with an approved solvent and dry
using lockwire MS20995C20.
thoroughly.
5-18.
(2) Inspect for damaged or loose connector
(13217E4157)
pins, damaged wires, and loose or damaged terminal
a. Removal.
lugs. Check for any evidence of burned areas indicating
disconnect the compressor wire harness assembly by
shorts. Inspect connectors for damaged or stripped
removing lockwire and disconnecting the four
threads.
connectors (P46, P48, P97, and P98).
d. Testing. Refer to the wire run chart in figure
b. Disassembly.
After inspection and testing,
disassemble the wire harness only as required for repair
or replacement.
e. Repair, Replacement and Reassembly.
c. Cleaning and Inspection.
(1) Solder connections will be made in
accordance with MIL-S-6872 using solder Type
(1) Clean wire harness with a clean, lint-free
SN60WRP2 per Fed Spec QQ-S-571.
cloth moistened with an approved solvent and dry
thoroughly.
(2) Replace defective wires with wire in
accordance with MIL-W-5086, Type II. Wire size and
5-23