TM 1-4920-445-13&P
0013 00
POSITIONING EYEWASH STATION FOR ASSEMBLY AND
BRACKET OPERATIONAL MODE (1036859) - CONTINUED
4.
Remove two bolts (Figure 1, Item 8), two lock washers (Figure 1, Item 7), and two lat washers (Figure 1, Item
6) located in shelter BII box.
5.
Remove eyewash station wall bracket (Figure 1, Item 5) from inside eyewash station.
6.
On expanded wall, align insert holes (Figure 1, Item 4) with eyewash station wall bracket (Figure 1, Item 5).
7.
Inspect two bolts (Figure 1, Item 8) for thread damage or rounded heads.
8.
Replace bolts (Figure 1, Item 8) if damage is detected.
9.
Attach eyewash station wall bracket (Figure 1, Item 5) by installing two bolts (Figure 1, Item 8), two lock
washers (Figure 1, Item 7), and two lat washers (Figure 1, Item 6).
10. Torque bolts (Figure 1, Item 8) 160-190 in. lbs.
Figure 2.
Position Eyewash Station.
11. Mount eyewash station (Figure 2, Item 1) onto wall bracket (Figure 2, Item 2).
12. Fill eyewash station with eye and face wash fountain solution IAW Sperian Fendall Pure Flow 1000 Eyewash
Station Owner s Manual.
END OF WORK PACKAGE
0013 00-3/4 blank